Description: Performance analysis of cooling system by heat balance and hydraulic calculations. Improvement needs have been assessed and reported. New piping design has been completed to increase cooling system performance.

Disciplines: Piping Engineering / Process Engineering

55MWe Power Plant Piping

Location: KahramanmaraÅŸ / Türkiye

Completion Year: 2025

Description: Design piping connections between turbine, cooling tower, steam generation, LNG and Water Treatment units. Piping 3D model, isometric drawings and MTO have been created. Stress analysis have been conducted and supports have been selected. Steel structures and pipe racks have been designed.

Disciplines: Piping Engineering / Civil Engineering / Piping Stress

Ekran görüntüsü 2025-01-23 171655.png

Head Office

YeniÅŸehir Mah. Ankara Cad. No:405 360 Office

Ofis:180 Kurtköy, Pendik/Ä°stanbul

ISO9001

9001-2024

ISO14001

14001-2024

ISO45001

45001-2024

Contact Us

info@flowioeng.com

+90 551 884 0507

  • Linkedin

© 2022 by Flowio Engineering. All rights reserved.

bottom of page