Heavy Industry


Cooling System Upgrade
Location: Türkiye
Completion Year: 2024
Description: Performance analysis of cooling system by heat balance and hydraulic calculations. Improvement needs have been assessed and reported. New piping design has been completed to increase cooling system performance.
Disciplines: Piping Engineering / Process Engineering
55MWe Power Plant Piping
Location: KahramanmaraÅŸ / Türkiye
Completion Year: 2025
Description: Design piping connections between turbine, cooling tower, steam generation, LNG and Water Treatment units. Piping 3D model, isometric drawings and MTO have been created. Stress analysis have been conducted and supports have been selected. Steel structures and pipe racks have been designed.
Disciplines: Piping Engineering / Civil Engineering / Piping Stress